Chapter 23 The official order
Wang Jianguo sighed.
His steel shelter is not big or small. They are basically composed of workers and families of the original steel factory. Total of two thousand people. In the past, it was somewhat of a small town.
"By the way, I remember you once said that your shelter uses a geothermal generator."
"Is that thing useful?"
"good."
"The stable supply of 300 kilowatt-hours of electricity is enough to support the operation of the entire shelter."
This is not a secret, Su Wu answered quite readily.
His geothermal generators and even design drawings are found online for free. Although it has been upgraded to the survival point later, it has certain black technology elements. But the basic principles are at most just advances in craftsmanship.
Not to mention it is exposed, even if it is sold openly as a product. Outsiders also praise the advanced technology at most and will not find anything surprising.
"so much?"
“Three hundred kWh of power generation.”
"It''s almost worth a small hydropower station of a large scale."
Su Wu''s answer not only amazes Wang Jianguo, but also makes the others in the group unable to help but watch.
Although small hydropower stations are inconspicuous, their power generation has been a considerable asset in peacetime. Now, if you save some money, it will be enough to maintain the basic living needs of hundreds of small and medium-sized shelters and tens of thousands of people.
It belongs to the current period and is the most typical symbol of the local tyrant.
"Can you buy some electricity from you?"
"My sanctuary is almost unable to afford lighting now, and there is no electricity everywhere."
A group member, the owner of the shelter named Heavy Knight, couldn''t help but ask.
His shelter, like Su Wu, is a small private refuge. It was not big, and he lived in the entire shelter himself and his family.
And small scale means low error tolerance.
With the only diesel generator in the shelter malfunctioning last night. His shelter was forced into a state of power shortage.
Fortunately, the air quality outside is still good now, and a lot of the poisonous gas produced by combustion has long dissipated. Otherwise, he would have to take his family to the official shelter.
"It''s OK to arrive."
"But I''m very far away from you, so it''s impossible to just pull the wire over."
Su Wu’s current shelter can’t even use up half of the power generation of the geothermal generator under normal conditions. A lot of excess electricity is wasted every day. If it can be used to exchange for something else, it would be better.
But in the end of the world, the most difficult part in resource exchange is not the resource itself, but the exchange process.
If this problem is not solved, the so-called transaction is nothing more than empty talk.
"It doesn''t matter."
"I have a lot of battery packs here, as long as I can charge the battery."
The reinstalled knight replied in a hurry. With the power emergency in the battery pack, it is almost enough to repair the generator.
As for how to send the battery pack to Su Wu, he could only bet on the risk himself, braved the heat and the extremely hot storm that could come at any time, and drove over in person.
"OK."
"Let''s have a private chat later."
Su Wu noticed more business opportunities from the words of the heavy-armed knight.
For the Recharge Knight, carrying a battery pack back and forth requires risking his life. But if it is changed to him, it doesn''t work. There are automatic, unmanned medium-sized trucks and construction robots in hand, and the medium-sized trucks still burn electricity instead of gasoline. As long as it is in the area around Jianghe City, the cost of delivery is almost equal to zero.
The difference between this is enough to make him earn another generous shipping fee.
A deal with the Reload Knight.
Next. Su Wu never received any request for a transaction again.
Although many people in the group were also jealous of Su Wu''s abundant electricity. But after all, they are not as good as the Reinstalled Knight, with a large number of batteries that can store electricity, and their situation is not yet at the end of their lives.
Just for some electricity that will not affect basic survival, it is far from worth their big fight to go for a special transaction.
In the doomsday, the greatest survival is. Everything else has to make way for this.
I spent more than half an hour chatting in the group.
After gaining a lot of useful and useless information and gossip.
Su Wu was about to quit and play the game for a while, when a somewhat unfamiliar group member Ye Luoshuanghua sent him a private chat.
"Is the geothermal generators you have for sale?"
"You want to buy it?"
Su Wu raised his eyebrows and became interested in his heart.
No mistakes, one song, one content, one in 6, one book, one bar, one reading!
The geothermal generator is of the same specification as that of a big guy in a small hydropower station. Although the size of the living point is not large. But in terms of value, one thing is to say, even if there is a steel shelter with two thousand people, it is not necessarily possible to buy it if it is sold out.
"I have consulted the database. In recent years, all relevant manufacturers and second-hand equipment circulating on the market do not have geothermal generators of your type."
"You should have the original design drawings for this kind of generator in your hand."
"If possible, not only the finished product, but also the drawings."
Ye Luoshuanghua said sincerely.
"Even the drawings?"
Su Wu was a little surprised to see it.
This requirement is not ordinary. If you want a drawing, it means that the opponent is confident that he can copy it completely. That is, retaining the minimum machining capability and a large number of engineers.
An ordinary refuge, even if its owner was once a billionaire, could not afford such a professional team.
“The finished product can be sold.”
"If you want the drawings, it''s useless if you ask for them."
"There are many core parts in it, and even before the end of the world, few companies can produce them."
After thinking for a moment, Su Wu chose to refuse to sell the drawings.
His geothermal generator drawings were originally public versions found on the Internet.
If there is no completion of the survival point in the future, even if it is strictly copied one to one according to the drawings, it will not meet the standards of a small hydropower station.
Selling the drawings to the other party is no different from making enemies.
"It''s okay to sell finished products."
"I booked two units and needed to install them. If it was transported, if it was inconvenient for you, I could send a fleet to assist."
The leaves fall and frost are not entangled, and they place the order directly and neatly.
He actually didn''t really like the drawings. It is not a particularly high-end equipment. As long as you have finished products in hand, it is not much more difficult to replicate. I proposed to purchase because I still needed Su Wu''s installation service.
It is not difficult to manufacture a geothermal generator itself, but during the installation process, it is not possible for any construction team to hit the pipes ten kilometers deep underground and truly absorb geothermal resources.
"How do you say the price?"
Looking at Ye Luoshuanghua''s attitude, she almost put the word "Not Short of Money" on her face.
Su Wu was in spirit.
I had a vague feeling that I seemed to have encountered an opportunity to take off.
(End of this chapter)